Subway service resumes on lines 2 and 4, TTC says

Subway service has resumed on Line 2 (Bloor-Danforth) and Line 4 (Sheppard-Yonge) following technical issues, the TTC says. The two lines were shut down for around 30 minutes. No details have been provided on the scope of the technical issues.