Intel

Intel Core Ultra 5 250KF Plus "Arrow Lake Refresh" Listed by Romanian Retailer

Intel's upcoming "Arrow Lake Refresh" are weeks away from the final release, but new listing suggests that there might be more SKUs getting a refresh makeover than we initially thought. In the latest listing by a Romanian retailer, there is a new SKU called Core Ultra 5 250KF Plus, with a code number BX80768250KF. The SKU is supposed to be the first version of the ARLR family with a "KF" mark, meaning that there won't be an integrated GPU in this processor Instead, only the CPU is provided, meaning that a GPU is mandatory, much like the previous KF SKUs. In the listing there is a mention of 4.2 GHz frequency, which aligns with the previously rumored Core Ultra 5 250K Plus and its P-core base speed of 4.2 GHz. This means that other specifications will remain similar to the Core Ultra 5 250K Plus, like the E-Core base speed of 3.5 GHz, E-Core turbo of 4.7 GHz, and P-Core boost frequency of 5.3 GHz. The only difference will be the lack of iGPU, as it has been a case with previous KF SKUs.

Interestingly, the Romanian retailer is also listing the Core Ultra 250K Plus (BX80768250K) and Core Ultra 270K Plus (BX80768270K), while the flagship Ultra 9 290K Plus is not yet listed. This doesn't necessarily mean the SKU won't exist, but rather that this preliminary listing is incomplete for now. As previous leaks suggest a March or April release of the ARLR family, we can expect the information and listings to intensify in the coming weeks. Some early benchmark runs also point to a 10% performance boost in flagship SKUs with the new refresh, so we have to wait and see how these mid-range chips perform in more testing.